INTERSTATE 81
I-81 Acceleration Ramp Extensions – Mile Markers 94 & 105
Pulaski & Montgomery counties | Updated Aug. 15, 2025
Construction begins in early September on two ramp extensions: southbound entrance at MM 94 and northbound entrance at MM 105. Work at MM 94 will occur first. Completion is expected summer 2026.
• Nighttime lane closures Sunday–Thursday, 9 p.m.–6 a.m.
• Shoulder closures and narrowed/shifted ramps overnight
• Two-week ramp closures (dates TBD; message boards will alert drivers)
I-81 Lane Widening – Exit 137 to Exit 141
Roanoke County/Salem | Updated Aug. 15, 2025
The $179 million project to widen I-81 from two to three lanes in both directions continues through early 2026. Two lanes remain open in each direction.
• Alternating nighttime lane/shoulder closures Sunday–Thursday, 8 p.m.–6 a.m. (lane widths reduced to 11 feet)
• Exit 140 on/off ramps closed Fridays & Saturdays, 8 p.m.–8 a.m.
• Possible flagging on Routes 635 & 619
• Work zones at Wildwood Road (Exit 137) and Thompson Memorial Drive (Exit 140)
• 60-mph work zone speed limit strictly enforced
I-81 Widening – Mile Markers 143 to 151
Updated Aug. 15, 2025
Survey and shoulder work underway; barrier wall installation expected late summer/fall. Completion slated for summer 2031.
• Nighttime lane closures Sunday–Thursday, 9 p.m.–6 a.m.
• Work zone speed 60 mph
• Possible daytime flagging on Belle Haven Road
• Ramps may be narrowed at Exits 143, 146 & 150
• Detour signs are for incident detours only, not permanent reroutes
I-81 Deck Overlay – Peak Creek (MM 95.7)
Updated Aug. 15, 2025
Bridge deck repairs under nighttime single-lane closures Sunday–Friday. Estimated completion summer 2025.
• Alternating NB/SB nightly lane closures (MM 94–96)
I-81 New River Bridge Replacement – Exit 105 NB
Montgomery County | Updated Aug. 15, 2025
Traffic shifted to new northbound bridge. Lane closures possible 8 p.m.–7 a.m.; shoulder closures anytime.
• Nighttime lane closures between MM 104–106
• Flagging on Route 605 below bridge
• Periodic slow-roll traffic holds for steel deliveries
• Work continues through 2025
I-81 Deck Patching – Botetourt County
Nighttime left/right lane closures northbound MM 160.8–162.3 and southbound MM 163.6–162.1, 8 p.m.–7 a.m.
INTERSTATE 581
I-581 Patching Operations
Updated May 16, 2025
Nighttime paving and patching Sunday–Thursday, 7 p.m.–7 a.m. Expect delays northbound & southbound.
ROANOKE CITY
Orange Avenue (Route 460) Off-Ramp Safety Improvements
Updated July 25, 2025
Shoulder, lane and ramp closures in both directions during nighttime hours. Delays possible.
ROANOKE COUNTY
Route 622 (Bradshaw Road) Culvert Replacement
Updated Aug. 1, 2025
Temporary signal controls alternating one-lane traffic 24/7. Ten-foot width restriction through Oct. 3. Completion expected October 2025.
Route 220/Route 419 Diverging Diamond Interchange
Updated Aug. 15, 2025
Long-term interchange reconfiguration underway with multiple intersection modifications. Expected completion fall 2028.
Route 220 at Southern Hills/Valley Avenue Intersection
Updated Aug. 15, 2025
Nighttime lane closures 7 p.m.–6 a.m. New traffic pattern now requires left/right turns with U-turns instead of crossing Route 220.
BOTETOURT COUNTY
Route 621 (Roaring Run Road) Culvert Replacement
Updated Aug. 8, 2025
Reduced to one lane with temporary signal. Completion fall 2025.
Route 943 (Branch Road) Culvert Replacement
Updated Aug. 8, 2025
One-lane traffic with 10-ft width restriction through September. Completion October 2025.
Hunter’s Green Subdivision Resurfacing
Updated July 18, 2025
Reconstruction underway; rough surfaces expected for 4–6 weeks until paving.
Route 622 (Dagger Springs Road) Extended Closure
Updated July 18, 2025
Closed for approx. four months for culvert and slope work. Completion August 2025.
Craig-Botetourt Scenic Trail Prep Work
Updated July 18, 2025
Brush cutting and stabilization ongoing on former C&O railbed; design schedule TBD.
MONTGOMERY COUNTY
Route 8 Park & Ride Project (MM 114)
Updated Aug. 8, 2025
Construction of new park-and-ride lot continues through winter 2027.
• Alternating lane closures on Route 8 and Route 666 (Mud Pike Road)
• Temporary lane shifts